Construction of the 90/33 kV Evacuation Substation for the 120 MW Wind Farm
Home Our Projects Construction of the 90/33 kV Evacuation Substation for the 120 MW Wind Farm
Site 1 : Sidi Daouad
- Electromechanical assembly, control, supervision, and commissioning of the SIDI DAOUD substation.
- Commissioning of two 40 MVA Areva transformers.
Site 2 : Metline and Mateur
- Supervision and commissioning of the substation.
- Supervision of assembly, testing, and commissioning of two wind farms in Bizerte.
- Bizerte Wind Farm Project, 90 kV Substation, Mateur Station: Assembly Supervision.
Site 3 : Kchabta
- Supply and reconfiguration of 2 MicroSCADA PCUs for the KCHABTA substations.
Other Interventions in Bizerte
- Project: Renovation of Oven 2, 7.5 kV, UNIGEAR type ZS1: Testing and Commissioning.
- Testing and Commissioning of the UNIGEAR Station.
Project Details
Project Owner:
Société Tunisienne de l’Électricité et du Gaz (STEG)
Project Manager:
ABB Espagne
GAMESA
Location:
Sidi Daouad, Metline, Mateur and Kchabta
Year:
2012