Construction of the 90/33 kV Evacuation Substation for the 120 MW Wind Farm

Home 5 Our Projects 5 Construction of the 90/33 kV Evacuation Substation for the 120 MW Wind Farm

Site 1 : Sidi Daouad

  • Electromechanical assembly, control, supervision, and commissioning of the SIDI DAOUD substation.
  • Commissioning of two 40 MVA Areva transformers.

Site 2 : Metline and Mateur

  • Supervision and commissioning of the substation.
  • Supervision of assembly, testing, and commissioning of two wind farms in Bizerte.
  • Bizerte Wind Farm Project, 90 kV Substation, Mateur Station: Assembly Supervision.

Site 3 : Kchabta

  • Supply and reconfiguration of 2 MicroSCADA PCUs for the KCHABTA substations.

Other Interventions in Bizerte

  • Project: Renovation of Oven 2, 7.5 kV, UNIGEAR type ZS1: Testing and Commissioning.
  • Testing and Commissioning of the UNIGEAR Station.

Project Details

Project Owner:

Société Tunisienne de l’Électricité et du Gaz (STEG)

Project Manager:

ABB Espagne
GAMESA

Location:

Sidi Daouad, Metline, Mateur and Kchabta

Year:

2012