Construction of the Bouchemma Power Plant
Home Our Projects Construction of the Bouchemma Power Plant
Construction of the Bouchemma Power Plant
- 2 × GE Gas Turbines × 126 MW
- GE Electrical Transformers 160 MVA 150/15 kV
Commissioning of the 150 / 15 kV Interconnection Substation:
- Testing and commissioning of electrical equipment.
- Verification and validation of control and protection systems.
- Dielectric testing of MV cables.
- Insulation testing of MV switchgear and functional validation of switches and circuit breakers.
Project Details
Project Owner:
Société Tunisienne de l’Électricité et du Gaz (STEG)
Project Manager:
General Electric (GE)
Location:
Bouchemma
Year:
2017