Construction of the Rades Power Plant

Home 5 Our Projects 5 Construction of the Rades Power Plant

Construction of the Combined Cycle Power Plant, Phase C, 480 MW :

  • BEST Electrical Transformers 420+220 MVA 225/15 kV.
  • Commissioning of the 6.6 kV MV Electrical Substation
  • Telephone and Intercom System

Commissioning of the 6.6 kV MV Substation:

  • Testing and commissioning of the substation.
  • Testing of control, command, and protection systems

 

Complete Commissioning of the Transformer:

  • Installation and connection of the transformer.
  • Analysis, filling, and treatment of transformer oil.

 

Execution of Electrical Tests on the Transformer:

  • Measurement of the transformation ratio (Ratio Test).
  • Measurement of winding resistance.
  • Measurement of insulation resistance and polarization index.
  • Dielectric tests and power factor measurement (Tan Delta).
  • Short-circuit impedance measurement.
  • Measurement of no-load and load magnetizing current.

Project Details

Project Owner:

Société Tunisienne de l’Électricité et du Gaz (STEG)

Project Manager:

GAMA SERVICE
Mitsubishi Power Europe, Ltd

Location:

Radès

Year:

2018