Construction of a Triple Superphosphate (TSP) Production Plant in M’dhilla 2
Home Our Projects Construction of a Triple Superphosphate (TSP) Production Plant in M’dhilla 2
Construction of a Triple Superphosphate (TSP) Production Plant in M’dhilla 2 :
- Electrical Transformers 30/5.5 kV
Study and Implementation of MV Protection Systems
- Conducting a Selectivity Study.
- Configuration of MV Protection Relays.
- Verification of Trip Curves and Adaptation to Network Requirements.
Validation and Qualification of MV Equipment
MV Switchgear:
- Dielectric insulation testing.
- Functional testing of circuit breakers and switches.
MV Cables:
- Insulation resistance testing.
- Dielectric strength testing.
MV Motors:
- Insulation resistance testing.
- Ohmic resistance testing.
Complete Commissioning of the Transformer:
- Installation and connection of the transformer.
- Analysis, filling, and treatment of transformer oil.
Execution of Electrical Tests on the Transformer:
- Measurement of the transformation ratio (Ratio Test).
- Measurement of winding resistance.
- Measurement of insulation resistance and polarization index.
- Dielectric tests and power factor measurement (Tan Delta).
- Short-circuit impedance measurement.
- Measurement of no-load and load magnetizing current.
Connection of the 25 MW Turbo-Generator to the STEG Network.
Project Details
Project Owner:
Groupe Chimique Tunisien (GCT)
Project Manager:
East China Engineering Science & Technology Co. Ltd. (ECEST)
Location:
M’dhilla
Year:
2017