Construction of the Mornaguia Power Plant

Home 5 Our Projects 5 Construction of the Mornaguia Power Plant

Construction of the Mornaguia Power Plant 640MW :

  • 2 × Ansaldo Energia Gas Turbines × 320 MW.
  • BEST Electrical Transformers 420+220 MVA 225/15 kV.
  • Commissioning of the 6.6 kV MV Electrical Substation.
  • Telephone and Intercom System.

Commissioning of the 6.6 kV MV Substation:

  • Testing and commissioning of the substation.
  • Control, command, and protection testing.
  • Dielectric test of the busbar compartment with “Generator Circuit Breaker”.

 

Complete Commissioning of the Transformer:

  • Installation and connection of the transformer.
  • Analysis, filling, and treatment of transformer oil.

 

Execution of Electrical Tests on the Transformer:

  • Measurement of the transformation ratio (Ratio Test).
  • Measurement of winding resistance.
  • Measurement of insulation resistance and polarization index.
  • Dielectric tests and power factor measurement (Tan Delta).
  • Short-circuit impedance measurement.
  • Measurement of no-load and load magnetizing current.

Project Details

Project Owner:

Société Tunisienne de l’Électricité et du Gaz (STEG)

Project Manager:

ETELEC
Ansaldo Energia

Location:

Mornaguia

Year:

2019