Construction of the Sousse Power Plant
Home Our Projects Construction of the Sousse Power Plant
Construction of the Combined Cycle Power Plant, Phase C and D, 480 MW :
- TAMINI Electrical Transformers 480 MVA 225/15 kV
Complete Commissioning of the Transformer :
- Installation and connection of the transformer.
- Analysis, filling, and treatment of the transformer oil.
Execution of electrical tests on the transformer :
- Measurement of the transformation ratio (Ratio Test).
- Measurement of winding resistance.
- Measurement of insulation resistance and polarization index.
- Dielectric tests and power factor measurement (Tan Delta).
- Short-circuit impedance measurement.
- Measurement of no-load and load magnetizing current.
Project Details
Project Owner:
Société Tunisienne de l’Électricité et du Gaz (STEG)
Project Manager:
ETELEC
Ansaldo Energia
Location:
Sousse
Year:
2016