Replacement of the Main Transformer at the Enfidha Cement Plant
Home Our Projects Replacement of the Main Transformer at the Enfidha Cement Plant
Replacement of the Main Transformer at the Enfidha Cement Plant :
- Schneider Electric 25MVA 150/5,5 KV
Dismantling of the Existing Transformer.
Complete Commissioning of the Transformer:
- Installation and connection of the transformer.
- Analysis, filling, and treatment of transformer oil.
Execution of Electrical Tests on the Transformer:
- Measurement of the transformation ratio (Ratio Test).
- Measurement of winding resistance.
- Measurement of insulation resistance and polarization index.
- Dielectric tests and power factor measurement (Tan Delta).
- Short-circuit impedance measurement.
- Measurement of no-load and load magnetizing current.
Project Details
Project Owner:
SOCIÉTÉ DES CIMENTS D’ENFIDA
Project Manager:
PTD ENGINEERING
Location:
Enfida
Year:
2024