Replacement of the Main Transformer at the Enfidha Cement Plant

Home 5 Our Projects 5 Replacement of the Main Transformer at the Enfidha Cement Plant

Replacement of the Main Transformer at the Enfidha Cement Plant :

  • Schneider Electric 25MVA 150/5,5 KV

Dismantling of the Existing Transformer.

Complete Commissioning of the Transformer:

  • Installation and connection of the transformer.
  • Analysis, filling, and treatment of transformer oil.

 

Execution of Electrical Tests on the Transformer:

  • Measurement of the transformation ratio (Ratio Test).
  • Measurement of winding resistance.
  • Measurement of insulation resistance and polarization index.
  • Dielectric tests and power factor measurement (Tan Delta).
  • Short-circuit impedance measurement.
  • Measurement of no-load and load magnetizing current.

Project Details

Project Owner:

SOCIÉTÉ DES CIMENTS D’ENFIDA

Project Manager:

PTD ENGINEERING

Location:

Enfida

Year:

2024